Lanskap TES
TPV · Panas Penyimpanan · 2026-11-20

Antora Energy

Heats solid carbon blocks to very high temperatures (up to about 2,400°C) with cheap renewable power, then delivers continuous industrial heat and steam or solid-state thermophotovoltaic (TPV) electricity.

Kantor Pusat
United States (North America)
Didirikan
2017
Media Penyimpanan
Solid carbon / graphite blocks (>1,500°C) + TPV cells
Rentang Suhu
600°C to 2400°C
Kesiapan Teknologi (TRL)
TRL 8 / 9 (Commercial)
Keluaran
process-heat, steam, electricity, chp
Indikator Kematangan

TRL 8 dari 9

Tahap pertumbuhan: Commercial · Kepemilikan: Startup

Modal dan Pendukung

Series C ($550M, Jul 2026)

Pendanaan kumulatif terungkap: ~$770M USD.

Pendukung: Eclipse, G2 Venture Partners, Breakthrough Energy Ventures, Lowercarbon Capital, Salesforce Ventures

Hibah / Program Publik: U.S. DOE & California Energy Commission grants

Proyek Unggulan dan Penerapan

ProyekLokasiKapasitasStatusTahun / Sumber
Big Stone Thermal Battery at POET Bioprocessing Big Stone City, South Dakota, United States 5 GWh(th) Commissioning 2026 · energy-storage.news

Tonggak Terbaru

2026-07 · pv-magazine-usa.com

Closed $550M Series C at a $2.47B valuation

Round co-led by G2 Venture Partners and Eclipse to fund a second U.S. factory alongside the San Jose plant. The Big Stone project went from construction to delivering energy in under 12 months.