TES Landscape
Hot TES · Hot Storage · 2026-11-20

Electrified Thermal Solutions (ETS)

MIT spinout whose proprietary electrically conductive firebricks (E-Bricks) act as both the heating element and the thermal storage medium inside the Joule Hive, delivering hot air and process heat up to 1,800°C.

Punong-tanggapan
United States (North America)
Itinatag
2021
Storage Medium
Electrically conductive firebricks (Joule Hive)
Saklaw ng Temperatura
400°C to 1800°C
Technology Readiness (TRL)
TRL 7 / 9 (FOAK)
Mga Output
process-heat, steam
Sukatan ng Kahandaan

TRL 7 sa 9

Yugto ng paglago: FOAK · Pagmamay-ari: Startup

Kapital at Suporta

Venture ($19M, Dec 2024) + DOE grants

Inihayag na kabuuang pondo: ~$23.5M USD.

Mga Tagasuporta: Holcim MAQER Ventures, Vale Ventures, GVP Climate, Clean Energy Ventures, Starlight Ventures

Mga Grant / Pampublikong Programa: U.S. DOE $5M award (Feb 2024)

Mga Flagship Project at Deployment

ProyektoLokasyonKapasidadKatayuanTaon / Sanggunian
Southwest Research Institute (SwRI) Full-Scale Joule Hive Thermal Battery San Antonio, Texas, United States 20 MWh(th), up to 1,800°C Operational 2025 · swri.org

Pinakabagong mga Milestone

2026-03 · swri.org

SwRI evaluating first full-scale Joule Hive thermal battery in San Antonio

Construction ran from August to December 2025 under DOE funding; the 20 MWh unit delivers heat up to 1,800°C.

2026-01 · canarymedia.com

ETS unveils commercial-scale heat battery and targets first customer units late 2026 or early 2027

The Boston-based MIT spinout has raised over $23M in private capital; a planned ISP Chemicals project in Kentucky is on hold.