TES 市场格局
Cold TES · 低温 储能 · 2026-11-20

Nostromo Energy

Developer of the modular IceBrick encapsulated ice storage system for commercial buildings and data centers. Its 1.4 MWh IceBrick system at the Beverly Hilton, launched in 2023, also serves the Waldorf Astoria Beverly Hills, and a DOE conditional commitment would back up to 193 California installations totaling about 450 MWh.

总部
Israel (Middle East)
成立年份
2017
储热介质
Modular encapsulated water/ice cells (IceBrick)
工作温区
-4°C to 0°C
技术成熟度 (TRL)
TRL 8 / 9 (Commercial)
输出形式
cooling
成熟度指标

TRL 8 / 9

成长阶段: Commercial · 企业性质: 初创企业

资本 & 投资背景

Private (delisted from TASE Aug 2024) + DOE LPO conditional commitment

累计融资未披露,或属成熟私企/子公司结构。

投资方: Migdal, Freepoint Commodities

资助 / 公共项目: U.S. DOE LPO conditional commitment for loan guarantee of up to $305.5M (Dec 2024, Project IceBrick)

旗舰项目 & 落地部署

项目地点容量状态年份 / 来源
Beverly Hilton and Waldorf Astoria Beverly Hills IceBrick system Beverly Hills, California, United States 1.4 MWh Operational 2023 · prnewswire.com
Project IceBrick virtual power plant California, United States Up to 193 buildings, about 170 MW / 450 MWh Under Development 2024 · prnewswire.com
Hartsfield-Jackson International Airport IceBrick systems Atlanta, Georgia, United States 3 systems, 2,200 ton-refrigeration-hours combined Under Construction 2026 · prnewswire.com

最新里程碑

2026-04 · prnewswire.com

IceBrick systems to be installed at Atlanta's Hartsfield-Jackson International Airport

Nostromo was selected to install three IceBrick systems totaling 2,200 ton-refrigeration-hours across three concourses, with completion planned for 2026.

2025-11 · prnewswire.com

Nostromo launches IceBrick360 cold thermal storage for data centers

The IceBrick360 unit is rated at 360 ton-hours, discharges over four hours, and is approved by the CPUC and CAISO as a standalone demand response resource.